This project was a custom bar creation for Mark in Avon Ohio.  The challenge for this project was that the basement was already finished and there was no existing plumbing for the wet bar area.  The closest tie in was approximately 30 feet from where the sink location was to be and was in the floor.  We opened needed to open the wall and bust into the cement floor in the furnace room to tie into the drain and water lines.  The bar was finished with a kegorater, bar fridge with 150 can capacity, granite counters and Kraftmaid cabinets.  During the opening of the wall it was discovered that the client had water infiltration coming through their poured cement walls.  We also sealed the water issue with an expanding epoxy and sealed the 1/8″ crack with top coat epoxy to eliminate this issue.

Willinger bar precounter Willinger bar tile

Willinger bar tile Willinger bar done

Willinger wall crack1 willinger wall crack

Leave a Comment

Your email address will not be published. Required fields are marked *