Posted by on Feb 15, 2013 in Bathrooms, Commercial Projects, Flooring, Tile | 0 comments

Hotel Renovation, Cleveland Airport Sheraton Hotel

bathroom3

Cleveland Airport Sheraton Hotel commissioned Remodel Me Today to renovate and remodel their presidential suite.  We prepped all walls and conditioned for 54″ vinyl wall covering.  Hung all wall coverings.  Basically gutted one full bathroom and a half bath.  Re-conditioned both spaces with new cabinets, counters and fixtures.  Removed existing floor coverings throughout the entire space.  replaced with new carpet and tile work.

entry tile  demo  shower  br1  main area3  demo2

Leave a Comment

Your email address will not be published. Required fields are marked *